Need an old fibro or asbestos-cement roof removed before re-roofing, renovation or demolition? ABS provides licensed asbestos roof removal across Newcastle, Lake Macquarie, the Hunter Valley and surrounding regions.
From residential homes and garages to sheds and larger structures, we manage the hazardous part of the project safely: assessment, removal planning, controlled roof-sheet removal, compliant transport, disposal and a clean handover for the next stage.

You do not need to make your roofer solve the asbestos problem. ABS can remove and dispose of the asbestos roofing first, leaving a clean, clearly scoped handover so your roofing contractor can move into the replacement stage without discovering asbestos halfway through the job.
Corrugated asbestos-cement roofing was widely used on older Australian houses, garages, sheds, carports and commercial buildings. Although the fibres in intact asbestos-cement products are bonded into the cement matrix, old roofing can become increasingly brittle after decades of exposure to sun, rain, wind, hail and general weathering.
That makes roof removal different from removing a sheet from a wall: the asbestos risk and the working-at-height risk have to be managed together.
Removal of asbestos-cement roofing before a residential re-roof, extension, renovation or knockdown-rebuild project.
Fibro and corrugated asbestos roofing on older detached garages, workshops, sheds and outbuildings.
Planned removal for older commercial and small industrial buildings, including projects requiring staged access and site controls.
Asbestos roofing removed in the correct sequence before partial or full structural demolition begins.
If the asbestos is not limited to the roof, ABS also provides broader asbestos removal in Newcastle for eaves, wall sheeting, wet areas, sheds and other asbestos-containing building materials.
Not necessarily.
If asbestos-cement roofing is in sound condition and will remain completely undisturbed, professional advice may be to manage and monitor it rather than remove it immediately.
Removal becomes much more relevant when the roof is deteriorating, damaged or standing in the way of planned work.
Weathering, cracking, broken sheets or storm damage can make an old asbestos roof increasingly difficult to manage safely.
If the asbestos sheets are being replaced with a new roofing system, the old asbestos roofing needs to be safely removed first.
Roof alterations, demolition and some installations can involve drilling, cutting, accessing or removing existing roof material.
Do not rely on the colour, profile or age alone. See our guide to asbestos testing in Newcastle to understand when representative sampling and laboratory analysis may be appropriate.
NSW rules require a licensed asbestos removalist when more than 10 square metres of non-friable asbestos-containing material is being removed.
A residential roof can exceed 10 m² very quickly. In practice, that means asbestos roof removal is usually well beyond the type of small asbestos job that should ever be treated as casual DIY work.
SafeWork NSW also requires licensed asbestos removal work involving more than 10 m² of non-friable asbestos to be notified at least five calendar days before work starts.
If your builder or roofer wants to begin next Monday, do not leave the asbestos roof until Friday afternoon. The asbestos stage should be identified early enough for inspection, quoting, required notification and safe removal to be properly sequenced.
You can review current SafeWork NSW asbestos removal requirements .
One of the reasons asbestos roof removal requires careful planning is that old asbestos-cement sheeting can become brittle.
It is not enough to wear asbestos PPE and climb onto the roof. The removal method also needs to account for roof access, fall protection, sheet condition, roof pitch, edges, fragile sections and how complete sheets will be lowered without being unnecessarily broken.
ABS has completed asbestos roofing projects using roof-rail systems and other project-specific controls to manage work at height safely.
We establish the roof-removal scope, access requirements, approximate amount of asbestos material and any connected materials that may also require attention.
Where testing is required, samples can be analysed through NATA-accredited laboratory facilities.
Required work planning, notifications, site controls and waste arrangements are then organised before removal begins.
Roof sheets are handled using methods designed to minimise unnecessary breakage and fibre release. The work area is controlled, asbestos waste is contained and the site is cleaned as removal progresses.
Asbestos waste is transported for compliant disposal, and the affected area is handed over ready for the next stage once the required removal and clearance process has been completed.
A good asbestos roof-removal scope should consider more than the obvious corrugated roof sheets.
Depending on the age and construction of the building, other materials around the roofline may also need to be identified before the project starts.
Two roofs with the same floor area can have very different asbestos scopes. Before comparing quotes, check whether connected asbestos components, access equipment, disposal and cleanup are actually included.
ABS has completed asbestos roof removal work across Newcastle and surrounding regions, including a documented asbestos roof removal project in Charlestown and roof work elsewhere across the region.



See more examples of completed work on the ABS asbestos removal and demolition projects page .
There is no useful one-price-fits-all rate for asbestos roof removal. The amount of roofing is important, but it is only one part of the quote.
Two 100 m² roofs can require very different labour, access and safety arrangements.
The quantity and weight of asbestos roofing affects labour, containment, transport and disposal.
A low garage roof with open access is very different from a steep, elevated or difficult-to-access house roof.
Broken, badly weathered or damaged materials may require additional care and change the removal method.
Ridge capping, eaves, gutters, gables, sheds and other connected asbestos products can all change the job.
When contacting ABS, send as much of this information as you can:
ABS's specialist role is asbestos removal, hazardous-material management, demolition and site preparation.
If you already have a roofing contractor, ABS can coordinate the asbestos removal stage so your roofer receives a clean, clearly defined work area for the replacement roof.
Tell us who is handling the replacement roof and your proposed roofing date.
The asbestos-removal stage can then be planned around the project's sequence rather than leaving a gap between contractors.
ABS can remove asbestos roofing first and then continue into the demolition scope where required.
See our house demolition Newcastle service for knockdown-rebuild projects.
Builders and roofers can bring ABS in specifically for the hazardous removal stage, while homeowners can engage us directly before their new roofing contractor begins.
An old roof covered in lichen, moss or weathering can be tempting to pressure-clean before deciding whether to replace it. Do not do this if the roof contains or may contain asbestos.
High-pressure water can damage the cement surface and spread asbestos contamination beyond the roof itself, including into gutters, surrounding ground and neighbouring areas.
Similarly, avoid sanding, grinding or drilling suspected asbestos roof sheets.
If sheets are cracked, broken or displaced, avoid walking on the roof or moving broken pieces yourself. Photograph the damage from a safe location and contact ABS so the condition and next step can be assessed.
Asbestos roofing cannot be placed in an ordinary rubbish bin or mixed into general construction waste.
It needs to be contained, transported and disposed of in accordance with NSW asbestos-waste requirements at a facility authorised to receive asbestos.
Locally, City of Newcastle's Summerhill Waste Management Centre can accept asbestos under specific conditions, including advance booking and asbestos handling requirements. Larger asbestos loads are also subject to NSW waste tracking requirements.
With ABS, compliant waste handling and disposal form part of the asbestos removal process, so the client is not left with asbestos sheets stacked in the driveway after the crew leaves.
Detached garages and sheds are one of the places older corrugated asbestos-cement roofing is commonly encountered.
Depending on your project, there are two very different scopes:
Remove the asbestos roofing while retaining the garage or shed for a new roof or future use.
Remove asbestos roofing and other asbestos components first, then demolish and clear the unwanted structure.
If your project involves an older outbuilding, see our guide to asbestos in sheds and garages in Newcastle .
ABS is based in Toronto NSW and provides asbestos removal and demolition services across Newcastle and the wider region.
For broader regional asbestos services, see: Lake Macquarie asbestos removal , Hunter Valley asbestos removal , Central Coast asbestos removal and asbestos removal in Wyong .
With asbestos roofing, the visible sheet is only part of the job. Licensing, planning, roof access, worker protection, containment, disposal and the condition of the site after removal all matter.
ABS combines asbestos-removal expertise with demolition capability, making us particularly useful for older properties where roof removal is part of a larger renovation, strip-out or knockdown-rebuild.
Builders, commercial clients and homeowners undertaking due diligence can view the ABS capability statement for licensing, insurance and certification information.
“Very reliable and thorough. Left the site clean with all rubbish removed.”— Marilyn, ABS customer
Age, appearance and roof profile can indicate that asbestos may be possible, but they cannot confirm it. If the material is uncertain and confirmation is needed, representative samples can be analysed by a NATA-accredited laboratory.
NSW requires a licensed asbestos removalist for more than 10 m² of non-friable asbestos-containing material. A typical house roof or substantial garage roof can quickly exceed that threshold. SafeWork NSW recommends using licensed asbestos professionals even for smaller quantities.
Cost depends on roof area, height, pitch, access, material condition, fall-protection requirements, connected asbestos components, disposal volume and the overall project scope. Send ABS photographs, your suburb and details of what will happen after removal for an accurate quote.
The on-site removal time depends on roof size, access, condition and complexity. The overall project program also needs to allow for planning and any required SafeWork NSW notification before licensed removal work begins.
No. You can engage a specialist asbestos contractor such as ABS to complete the asbestos-removal stage before your roofing contractor installs the replacement roof. This can be particularly useful if your roofer does not carry the relevant asbestos removal capability.
Yes. Provide ABS with your proposed roofing program so the asbestos stage can be coordinated with the replacement work. Confirm the exact scope and handover requirements when obtaining your quote.
No. High-pressure cleaning can damage asbestos-cement material and spread fibres and contaminated debris beyond the roof. Suspected asbestos roofing should not be pressure-washed, sanded, ground or aggressively cleaned.
Avoid walking on damaged asbestos-cement sheeting or handling broken fragments unnecessarily. Keep people away from the affected area, photograph the roof from a safe position if possible, and contact an asbestos professional to discuss assessment or make-safe requirements.
It depends on what those components are made from and the agreed scope. Older roof systems can include asbestos-containing ridge capping, gutters, downpipes, eaves, gables or other components, so these should be considered when the roof is assessed and quoted.
Yes. ABS provides both licensed asbestos removal and demolition. Where an old shed or garage is being removed entirely, asbestos materials can be managed first and the remaining structure can then be demolished and cleared as part of the project scope.
Asbestos waste must be contained, transported and disposed of in accordance with NSW requirements at a facility authorised to receive asbestos waste. ABS manages compliant asbestos disposal as part of its removal work.
ABS provides asbestos removal and demolition services across Newcastle, Lake Macquarie, the Hunter Valley, the Central Coast, Wyong and surrounding areas. Contact the team with your suburb to confirm service availability for your project.
Whether you are re-roofing an older home, removing a fibro garage, preparing for solar or renovation work, or getting ready for a knockdown-rebuild, talk to ABS before the asbestos roof becomes a delay.
Send us your suburb, a few photographs of the roof and a short description of what you plan to do next. We can assess the removal scope and help you plan the asbestos stage properly.